Year end machinery relocations

The quieter weeks around the year end are a popular time to move machinery. Here is how to plan a relocation that fits your shutdown.

For many factories and workshops, the end of the year is the one time production slows down. That makes late November and December a popular window for moving machinery, whether it is a single machine changing bays, a new line going in or a whole workshop relocating. With a little planning, the move can fit neatly into your quieter weeks.

Machine being lifted inside a workshop
Lifting a machine inside the workshop

Start with the machine

The first step is understanding what is being moved. Tell us what the machine is, its approximate size and weight if known, and whether it has lifting points or forklift pockets. Manufacturer details or a data plate photo are very helpful.

Before the move, the machine should be isolated from power, air and other services by your own engineers or a qualified contractor. Loose parts, tooling and fluids should be secured or removed, and any guards that could be damaged should be taken off or protected.

Inside the building

Many machinery moves start indoors. A HIAB lorry can sometimes reverse inside a large factory or loading bay to lift a machine directly, which saves extra handling. Tell us about door heights and widths, floor surfaces, internal routes and anything overhead such as cables, pipes or lighting.

Scania HIAB lorry inside a factory
A Scania HIAB set up inside the factory

Where the lorry cannot get inside, the machine needs bringing to the doorway first, ready for the HIAB to lift it onto the bed. Every lift is planned before the vehicle is booked, so the method is agreed in advance.

It is worth clearing the route between the machine and the door before the day. Pallets, racking, benches and stored stock can all get in the way, and a clear path makes the move calmer and safer. If other machines sit close by, think about whether they need protecting with boards or covers while the lift takes place.

Timing around the shutdown

Year end shutdown dates fill up quickly, both for haulage and for the engineers who disconnect and reconnect machines. Booking early gives you more choice of dates and time to line up everyone involved. If you are moving between sites, think about the new location too, so the floor, foundations and services are ready when the machine arrives.

Articulated lorry inside a factory loading bay
An artic in the loading bay ready for the machine

Some moves suit an artic HIAB or a low loader, depending on the size of the machine and the distance. We choose the vehicle around the load and the lift at each end, and there is more about this on our machinery transport service.

Plan it before the year closes

A well planned machinery move means your equipment is in its new position and ready to be commissioned when the new year starts. Our drivers are ALLMI trained, and we are happy to provide lift plans and method statements for your records.

If you have machinery to move over the year end, email us with details and photos of the machine and the building, or send your job through our quote form. Tell us about the load and we will plan it.

Questions about this article

Who disconnects the machine before the move?

Your own engineers or a qualified contractor should isolate power, air and other services before the lorry arrives, and reconnect them afterwards.

Can a HIAB lorry lift a machine from inside a building?

Sometimes, where there is enough door height, floor space and room overhead. We look at this when planning the move, and agree the method before booking.

Tell us about your load

Send us the collection and delivery points, what needs moving and any photos of the site. We plan the lift and come back to you with a price.